Salient Features:
GENERAL INFORMATION | |
Water Source | Lagan & Nyamya Masal Rivers |
Capacity | 15.15 MW |
Location | Jugal Rural Municipality |
District | Sindhupalchowk |
Construction Period | 2085-03-18 |
POWER DEVELOPMENT | |
Type of Project | Run-of-river |
Design Discharge | 4.1 m3/s (Q45%) |
Catchment Area | 110.63 km² |
Gross Head | 463.00 m |
Net Head | 444.44 m |
Installed Capacity | 15.15 MW |
Total Annual Salable Energy | 89.049 GWh |
Dry Energy | 26.72 GWh |
Wet Energy | 62.33 GWh |
Transmission Line | 5 KM length 132 KV Single Circuit feeding to Brahmayani Switcyard |
Power House Type | Surface |
Headrace Tunnel | |
Type | D-shaped, Pressurized |
Sizel | 2.8mX3.0m |
Length | 1481.75m |
NWL at Inlet portal | 3060.58 m |
TURBINES | |
Type of Turbine | Horizonal Pelton |
Number of Unit | 2 Nos. |
Rated Output | 7.575 MW X 2 |
Efficiency | 90% at rated discharge |
Rated Net Head | 444.44 m |
PROJECT COST & FINANCIAL INDICATORS | |
Total Project Cost (Without IDC) | NPR 234 Crore (Approx) |
Total Project Cost (With IDC) | NPR 312 Crore (Approx) |
Cost Per MW (Withot IDC) | NPR 15.74 Crore (Approx.) |
Cost Per MW (With IDC) | NPR 20 Crore (Approx.) |
ROE (Return on Equity) | 19.72% |
NPV (Net Present Value) | Rs. 789,624,000.00 |
Pay Back Period- Discounted | 6.34 Years |
Expected Revenue (1st Year) | Rs. 512,859,000.00 |
Expected Revenue (8th Year) | Rs. 617,423,000.00 |